While Stephen and Lori were out of town, lots of folks descended on the A&TC to get more work done.
- On July 17, Johnny and Ken cleared and then trenched the path for the final RV utilities. They also moved dirt for the ramp from the mainline to the turntable and moved most of the pile of cedar logs (future posts) to clear for parking.
- On July 26, Ken, Linda, James, John T, Sofia, Luke, Caleb, and Sabrina spent the day adding conduit and waterlines for the RV utilities and testing all buried waterlines.
- On July 27, Stephen, Ken, and Linda added faucets for the steaming bays and did the final test of all waterlines. The steaming bay utility posts were re-surveyed for their final placement and electrical boxes were added. Warning tape was added to trenches and multiple trenches were filled.
Photos from Ken











Photos from Linda






Photos from Stephen