Light crew this past weekend, September 20th, with just John T, John O, Ken, Linda, Lori, and Stephen working.
On Friday, Ken installed all remaining switch stands and attached angle iron rails on 2x6s for the transfer table. On Saturday, the guys moved many tons of ballast to San Jacinto to ease the grade. John O will be setting up a shower room for the meet. Stephen installed all remaining posts and solar lights and levelled the temporary transfer table site.
Linda and Lori prepared a great lunch featuring sausage and peppers on rolls.